Snowy 2.0 Surface Works

Overview

Snowy 2.0 is Australia's largest renewable energy infrastructure project — a 27km underground pumped-hydro scheme linking the Tantangara and Talbingo reservoirs. Reprise Electrical was engaged to deliver surface electrical works including high-voltage substations, motor control centres and instrumentation across the project footprint, working in an extremely remote and technically demanding environment.

Project Details

Client

Snowy Hydro / Head Contractor

Location

Khancoban, NSW

Division

Industrial

Year

2024

Approx. Value

$12M+

Duration

30 months

Scope of Works

  • HV substation design, construction and commissioning to 33kV

  • Motor control centre (MCC) supply, installation and termination

  • Instrumentation and control cabling across difficult terrain

  • Traction power supply infrastructure and earthing systems

  • Cable management across remote, high-altitude site conditions

  • Hazardous area classifications and Ex-rated installations

  • HV switching programme and energisation procedures

  • Commissioning, integration testing and handover documentation

Outcome

Delivered critical electrical infrastructure on Australia's most significant energy project on programme. Works contributed directly to the broader project milestone schedule for this nation-defining piece of energy infrastructure.